The Municipality of Anchorage (MOA) is planning to repave a two-mile segment of Lake Otis Parkway between Abbott Road and Huffman Road. The project is currently funded with Municipal bonds approved by Anchorage voters as part of the MOA’s annual general obligation bond election.

Project Purpose:

This project will rehabilitate the pavement along Lake Otis Parkway between Abbott Road and Huffman Road. The pavement surface is showing signs of distress (raveling, potholing, rutting) and is deteriorating. In addition, most of the curb ramps do not meet Americans with Disabilities Act (ADA) standards and the pathway is showing signs of failure. The purpose of this project is to improve roadway drivability and upgrade pedestrian facilities to meet ADA standards.

Project Scope:

The project will be constructed in two phases:

  • Phase 1 – O’Malley Road to Abbott Road
    • Construction started in 2023 and will wrap up in 2024
  • Phase 2 – Huffman Road to O’Malley Road
    • Improvements are expected to include:
      • Repaving Lake Otis Parkway
      • Storm drain rehabilitation
      • Curb ramp replacements to meet ADA
      • Sidewalk repairs
Project Area:
Recent Project News

Anchorage Transportation Fair
March 28, 2024
3:00-7:00 PM
Alaska Airlines Center, 3550 Providence Dr.

Stop by anytime to hear more about the project!

Don’t miss out!
Sign up to receive project email Updates!
Invalid email address

© 2022 Kinney Engineering, LLC